Kiev, that historically was situated on the right bank of the Dnieper River, covers both banks of the river whose width, as it flows through the city, reaches some several hundred metres. Additionally, several tributaries fall into the Dnieper inside or just north or south of the historic city. Currently there are eight bridges spanning across the river and a few dozen bridges across the canals and Dnieper tributaries.
Due to the location and the width of the river, the bridges have always been a very attractive and hard to realize option throughout the long history of Kiev.
The temporary floater bridges were known to have existed since the 12th century. The stationary bridges existed in Kiev from mid-19th century, but none of them survived through the turbulent events that followed the 1917 Russian Revolution.
According to the chronicles, the earliest floating bridge across the Dnieper River in the area was built in the 1115. It was located near Vyshhorod or, according to different accounts, near the Vydubychi Monastery. Records exist about another floater in the 17th century with stationary approaches from the shores.
Such bridges could only be temporary as Dnieper ices in most winters at the Kiev's latitude and the pillar's icing and the roaring ice drift each spring remain a concern even for modern bridges. Additionally, the river stream was especially strong before the Dnieper was dammed in the 20th century. Therefore, the cross-river traffic was carried by boats and ferries throughout centuries.
From the mid-19th century to the mid-20th century, Kiev was served by two stationary bridges. Both bridges had similar fates. Built at the times of the industrial revolution in the Russian Empire these engineering masterpieces of their time survived World War I and the Russian Civil War. Both were blown up in 1920 by the Polish troops retreating from Kiev following their unsuccessful armed intervention into Ukraine.
The first stationary bridge in Kiev was built between 1848 and 1853.[1] This 770 m (2,526 ft)-long Nicholas Bridge was a chain suspension bridge rested on five pillars. Being one of the largest and most beautiful bridges in Europe, it was the pride for the city until it was blown up in 1920 by the Polish troops. The heavily damaged bridge was not subject to the restoration and in 1925 a new bridge was constructed in its place under the name Yevheniya Bosh Bridge (see below).[2]
The second stationary bridge was built in 1868-1870 with the construction supervision conducted personally by Amand Struve.[3] This over 1 kilometre long railroad truss bridge was initially named to its constructor, engineer Struve. Standing on 13 piers, over 1 km (0.62 mi) long, the bridge was the longest in Europe at that time. During the construction Struve first in the Russian Empire used caisson method to lay the foundation . On February 17, 1870 the first train by the Kiev-Kursk railroad company arrived through the bridge to the Kiev railroad station. Similarly to the Nicholas Bridge, the Struve Bridge survived World War I and the Civil war, but was blown up in 1920 by the retreating Polish troops (see: Kiev Offensive).
The bridge was built in 1906 and was blown up in 1943 by the retreating forces of Nazi Germany. Rusanivsky bridge connected the Darnytsia region with the city of Kiev by the Brovary chaussée (highway). The bridge was designed by architect V.Apishkov. In 1965 in its place was erected the Metro Bridge and the Rusanivsky Metropolitan Bridge (extension of the first) which both are part of the Svyatoshyno-Brovary Subway Line (SBL).
New bridges were built in the early Soviet years but were destroyed in the first months of the 1941 Nazi German invasion. Restored by forced labor of war prisoners and civilians during German occupation they were blown up again by Germans when they retreated from Kiev in November 1943.[4]
Within months after the Polish troops blew up the original chain bridge, that very summer 1920 the Ukrainian engineer Evgeny Paton proposed the reconstruction project that would have reused the old chains to be lifted from under water. However, rusting made the metallic parts of the old bridge unusable and for the following two years Paton worked on several projects of the Nicholas bridge's restoration. He ended up proposing to construct a totally new bridge but this proposal was declined by the supporters of the reusing of the old elements from underwater. The year of 1923 passed in arguing between the two proposals. The construction overseen by Paton was finished by 1925 and the completed bridge was named after the former Soviet People's Secretary of Internal Affairs and a fierce Bolshevik Yevgeniya Bosch.[5]
Following the Nazi attack on the Soviet Union, the bridge was destroyed on September 18, 1941 by retreating Soviet forces. A ponton bridge was built on its place by forced labour under German occupation, which was destroyed again by German troops retreating from Kiev.
The replacement Darnytskyi railroad bridge was built in early 1920s but shared the fate of the Bosh Bridge. Destroyed in the first months of the Great Patriotic War, it was restored during German occupation by forced labor, and was destroyed again by retreating German troops.
During the Battle of Kiev, Red Army's attempt to catch the bridge by landing forces was unsuccessful. The Germans blew up the bridge on the eyes of the Soviet landing force unit. The landing unit was disbanded for the operation failure.
Immediately after the liberation a temporary wooden bridge was built at the location of the blown up Darnytskyi bridge by the Red Army engineers in the record thirteen-day time (some sources cite thirty days) in the urgency to facilitate the pursuit of the German army on its retreat from Ukraine. The record short construction time plan was met despite the frequent German bombing raids. 50,000 Kievans took part in the bridge construction.
A few years before World War II the Soviet government planned two underground railroad lines to be laid underneath the bedrock of Dnieper river. One tunnel line (Northern) would have stretched from the Obolon neighborhood (Obolon Raion) and to what is known as Vygurivshchyna (Desna Raion) near Voskresenska Slobidka on the left-bank of Dnieper in the close proximity of Troieschyna. Another line (Southern) was planned to cross Dnieper from the Zhukiv Island to Osokorky (Darnytsia Raion). The project came up in a fear that in case of a war the bridges over the Dnieper were a vulnerable part of the regional transport infrastructure, and tunnels might be a long-term strategic solution.
The construction started in 1936 was planned to be finished sometime in 1944. The NKVD oversaw the project, drafting hundreds of military, civilian and prison workers to work on it. The underdeveloped technology of the time required special makeshift caissons (vertical mines for ventilation and soil extraction) to be built in the middle of the river. Due to technical failures and the start of the war, the construction was never finished or even disclosed to the public. The builders were able only to connect the Right Bank with the close Zhukiv Island (where the present-day southern port is situated). The flooded entrance to the tunnel and abandoned caissons can now be seen in the forests and bays of Holosiivskyi Raion. Contemporary amateur researchers believe that a large secret base component of the project, including a train station, barracks and mass graves of workers, are also located in the depths of the tunnels.[6]
After the start of the World War II all tunnel construction (known as the Construction No.1) was suspended and afterward recognized as unreasonable. Nonetheless the entrances to the unfinished tunnels still exist around the mentioned neighborhoods, which are mostly unguarded.
The automobile-only Moskovskyi ("Moscow") Bridge (), designed by the architect A.V.Dobrovolsky and engineered by G.B.Fux, was built in 1976. It is a cable-stayed bridge, with the beam of the main span being held by a cluster of steel ropes which are fixed to a 115 meters tall A-pylon.[7] The bridge consists of two spans: a 816 m (2,677 ft) long and 31.4 m (103 ft) wide span across the Dnieper and a 732 m (2,402 ft) long, 29.1 m (95 ft) wide span across the Desyonka, a Dnieper tributary.
The northernmost of the city bridges, Moskovskyi Bridge is a key structure on the northern end of the Kiev Smaller Ring Road, connecting Petrivka to the densely-populated north-eastern residential neighborhoods, mainly Troieschyna. From the moment of its construction the bridge was built as a high-speed motorway, which it remains to this day.
The Podilskyi Railroad Bridge () is made of steel trusses. It was originally built in 1929 and was known as Petrovskyi Bridge at that time. Like other bridges, it was blown up in the course of World War II, but was not heavily damaged and was reopened in 1944.[8]
The Podilskyi Railroad Bridge completes the railway circle around Kiev. However, the bridge is limited to slow-speed rail traffic due to its age.
A steel bridge connects Podil neighborhood to the Rybalskyi Peninsula over the Kiev Harbour. In the 1990s, the bridge was found unsafe for automobile traffic and since 2001 it was reserved for pedestrians only. The bridge is fenced off from February 2, 2009 and will be dismantled.[9]
The automobile-only Havanskyi ("Harbour") Bridge was opened on 17 December 2007 for automotive traffic from Podil towards Obolon across Havan' (Ukrainian: Гавань) — the harbour in the mouth of the former Pochayna River, with the construction being started in 2003, serving as a substitute for the closed Rybalskyi Bridge. On October 23, 2010 the bridge was opened for two-way traffic together with an adjacent flyover on the right bank.[10]
The Parkovy Bridge aka Pedestrian Bridge (), designed by architect V. Suvorov and engineered by V. Kiriyenko, was built in 1957. The bridge is a light construction 400 m (1,312 ft) in length that connects Kiev to the park-area Trukhaniv Island. This is the only bridge constructed specifically for the pedestrian traffic over the Dnieper fairway, and for this reason it's formally included in the number of Kiev bridges across Dnieper.
The automobile-only Venetian Bridge, designed by architect A. Ilyashenko and engineered by V. Koval, was built in 1966. The bridge spans the Venetian Canal dividing the Hidropark Island and the Dolobetskyi Island.
The Rusanivka Bridges were built in the 1960s over the Rusanivka Canal, connecting the neighborhood with the rest of Left Bank city. There are 5 bridges, 2 of them are exclusively pedestrian. Prior to World War II Rusanivka has been connected to the rest of Kiev by a bridge, but it was destroyed during the war. The Rusanivka bridges are a popular place for amateur fishermen.
The auto-and-rail Metro Bridge (), engineered by G. Fux and Y. Inosov and built in 1965. The bridge is used for both the Sviatoshynsko-Brovarska Line of Kiev Metro and automobile traffic (being part of the Brovary Parkway). The Metro bridge consists of two spans as it links the central Hidropark island as well as the left and right banks. The larger span consists of an elevated central Metro span and side automobile spans on separate, lower estacades. Both the Metro and automobile paths have a distinct arched contour. This was because the Metro line continues into the hill of the right bank with the Dnipro station.
The smaller span called Rusanovsky Bridge which links the Hidropark with the left bank is a more conventional level estacade with two northern traffic lanes and a southern Metro path.
The 1,543 metres long automobile-only Paton Bridge (), built in 1953, is the longest of the Dnieper bridges in the city. It was the first fully welded steel construction of such length in the world to the date of completion and it was the longest bridge in Europe at that time. The bridge was named after Evgeny Paton, the famous welding engineer who developed the technology for the structure. He died a few weeks before the construction was completed, never seeing his masterpiece.
Initially carrying the automotive traffic and cross-Dnieper tram lines, the bridge have recently been renovated. The tram rails were removed and the electric trolley bus infrastructure was added to the bridge. Shutting down the tram line that historically served the bridge has met the mixed reception from the Kievans, despite the municipal authorities claimed that the tram service over the bridge has become impractical.
The bridge currently has 3 traffic lanes in both directions and one reversible lane connecting Pechersk to the Left Bank.
The old Darnytskyi Railroad Bridge (), engineered by I. Barenboym and E. Radzevich, was built in 1949. It took the place of an older bridge, which was destroyed in 1941 in the first days of the German invasion of the Soviet Union (see the earlier history section.).
The New Darnytskyi Bridge is an auto-and-rail bridge, almost constructed 50 m (164 ft) south of the existing Darnytskyi Railroad Bridge. The bridge carries 2 lanes of railroad, and 6 lanes of auto traffic.[11] The bridge's expected capacity is 60,000 vehicles and 120 pairs of trains per day.[12] Already operational as itself, the bridge complex now lacks road connection ramps from some directions which are still under construction. Additional railroad links to match new bridge' capacity are also being constructed. On September 27, 2010 the railroad part of the bridge was officially opened; on March 31, 2011, road traffic opened.[13] As of the last government notice, the bridge was expected to be completed in 2012.[12] Following the construction of the bridge, a new major passenger terminal will be completed in the Darnytsia Railway Station on the Left Bank of the city.
The auto-and-rail Pivdennyi ("Southern") Bridge (), designed by the architect A. Gavrilov and engineered by G. Fux, was built in 1990. It is the second metro bridge in Kiev, serving both the Syretsko-Pecherska metro line and automobile traffic. The shrouds holding the spans on the bridge are supported by a two-column ferroconcrete construction 115 m (377 ft) in height.
The bridge currently has 3 traffic lanes in both directions. It connects the Vydubychi to the rapidly-developing left-bank Darnytsia neighborhood, completing the southern end of the Kiev Smaller Ring Road route.
Due to a large traffic increase since the late 1990s, more bridges are needed to avoid traffic jams on and around already existing bridges. Specifically, the central rail route from the central railway terminal via the Darnytskyi Bridge is overloaded, limiting the railroad traffic in Eastern Europe.
Two bridges are currently under construction (one, the New Darnytskyi Bridge, already operational) and one more is planned according to the Kiev Development Plan. In addition, in 2006 a project was unveiled to provide decorative night illumination to most of the bridges.[14]
The construction of a new 7 km (4 mi) long metro/automobile bridge () is underway on Trukhanov Ostriv, on the midway between existing Moskovskyi Bridge and Parkovy Bridge. The bridge is a part of the future Podilsko-Voskresenska Line, and it will carry 3 lanes of auto traffic in both directions. However, the project is complicated by the serious land-owning, environmental and architecture-preserving issues. The construction is contracted by the Kiev municipality.
As of December 2011, the legal issues has been settled with the private owners of the land and the construction process were finally expanded to the Trukhaniv Island.
Despite the mid-XX century failure, the idea of underriver tunnels, which is relied on much advanced metro technologies, is still on Kiev city planner's table. Tunnel projects are recently being included in some of proposed Kiev development plans as a way to move the main traffic flows in the city center underground. However, most experts agree that such projects are both unaffordable and technically infeasible at this time.
Recently, Kievavtodor road company and the institutes of Kievdormostproekt and Kievproekt were working out plans for a tunnel system which would connect the left and right banks of Kiev.[15] City authorities welcomed the plan, which would ease the traffic congestion of Kiev's bridges.[15]
In case of war/terrorism emergency, the make-shift pontoon bridges are to be established in the city. A special Pontoon-Bridge Brigade of the Armed Forces is based on the Left Bank, ready to use its truck-based automatic bridges and docking boats. Such equipment allows automobile and limited railroad connection over the river, and is frequently used in military maneuvers.
|
|